{"id":1885,"date":"2023-12-15T08:36:24","date_gmt":"2023-12-15T08:36:24","guid":{"rendered":"https:\/\/www.cordia.gr\/case-study\/stavros-niarchos-foundation-cultural-centre\/"},"modified":"2024-02-19T14:41:26","modified_gmt":"2024-02-19T14:41:26","slug":"stavros-niarchos-foundation-cultural-centre","status":"publish","type":"case-study","link":"https:\/\/www.cordia.gr\/en\/case-study\/stavros-niarchos-foundation-cultural-centre\/","title":{"rendered":"Installation of charging stations \u2013 STAVROS NIARCHOS FOUNDATION CULTURAL CENTRE"},"content":{"rendered":"\n<p class=\"wp-block-paragraph\">In cooperation with Fysiko Aerio, our company installed twenty-five charging stations in the visitors\u2019 carpark at the SNFCC. The project is currently under construction and will be delivered to the public in early October.<br\/>This project is especially significant, as it is one of the largest projects carried out by our company and involves charging stations for electric vehicles to be used by the public.<\/p>\n","protected":false},"featured_media":1735,"template":"","meta":{"_acf_changed":false},"class_list":["post-1885","case-study","type-case-study","status-publish","has-post-thumbnail","hentry"],"acf":[],"_links":{"self":[{"href":"https:\/\/www.cordia.gr\/en\/wp-json\/wp\/v2\/case-study\/1885","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.cordia.gr\/en\/wp-json\/wp\/v2\/case-study"}],"about":[{"href":"https:\/\/www.cordia.gr\/en\/wp-json\/wp\/v2\/types\/case-study"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.cordia.gr\/en\/wp-json\/wp\/v2\/media\/1735"}],"wp:attachment":[{"href":"https:\/\/www.cordia.gr\/en\/wp-json\/wp\/v2\/media?parent=1885"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}