ΙοΤ Solutions

Building Management System at Nexi building in collaboration with Controline and Schneider Electric

Completion of the first phase of the project for the installation of a new Building Management System in the Nexi building in cooperation with Controline and Schneider Electric. The project includes more than 800 physical signals and the integration of 3rd Party Equipment with BACnet, Modbus and LoRaWAN communication protocols.

We are very grateful to Controline for the flawless cooperation and support.


ΙοΤ Solutions

Installation of Energy Meters & Energy Platform – Energy Management in Pressious Arvanitidis.

The installation of the energy metering equipment at Pressious Arvanitidis’ industry in Thiva was successfully completed, followed by the configuration of the energy platform, and testing for correct measurements and statistical results. The project comes to enhance our close cooperation with Pressious Arvanitidis aiming to monitor the energy consumption of the production line and office space, in order to achieve optimal energy management and reduce the company’s consumption and energy footprint.

phone